Delivery of our first Dekomp plant
The delivery has taken a long time but it is finally in place.
The customer buys locally produced biogas on a flatbed for his process.
The pressure must be lowered from 200bar, down to 20bar and have a constant flow of about 70m3/h. The gas is heated before the regulators through a glycol heat exchanger, then the pressure is reduced in two stages.
It's fun when you find new ways to use biogas!